Mannington Pool Park
Mannington, West Virginia, USA
Project Overview
Originally built in 1929 by the residents of Mannington, the city’s aging public pool, Mannington Pool Park, was long overdue for a full transformation. After nearly a century of use and multiple repairs, the original structure—comprised of two pools separated by a solid concrete wall—could no longer be patched or maintained effectively.
Natare Pools was originally approached about our stainless steel gutter systems, but after further discussions, the City quickly discovered we could offer a far more comprehensive solution. When introduced to our full stainless steel pool systems, vacuum sand filtration, and reinforced PVC membrane lining, we were chosen to supply and integrate the entire pool system, helping bring the project under budget without compromising on durability or design.
Natare Systems & Materials
- All-Welded Stainless Steel Pool Walls
- MS1000 Roll-Out Stainless Steel Perimeter Gutter System with embedded depth markers
- Natatec® PVC Pool Lining System in Adriatic Blue with termination skirt
- MicroFlo® Vacuum Sand Filtration System
Pool Facility Details
- L-shaped pool layout
- Zero-entry ramp (0″ to 3′)
- Maximum Depth: 5 feet 6 inches
- Special Features: New splash pad adjacent to the pool deck
The upgraded aquatic facility replaced the old dual-pool design with a single, seamless L-shaped pool—providing flexibility, lower maintenance, and a welcoming space for swimmers of all ages and abilities.
Project Impact
By working directly with the City of Mannington and providing a complete aquatic solution, Natare helped preserve the spirit of a historic community pool while delivering modern technology, cost-efficiency, and long-term performance. The result is a revitalized facility ready to serve future generations.